CONSULTANCY PROJECTS
(Total: 577.31 lakh; PI: 14.16 lakh; Team Member: 563.15 lakh)
SN
Title of Project
Project Category
Funding Agency
Project Cost (Rs.)
Role and Status
1
Investigation of distressed multiple cell bridge at ch.53+005 on NH-11, Bikaner-Philodi Highway
CNP2660
IRCON International Limited
14.16 lakh
Project Leader
Status: Ongoing
(16.12.2020 to 15.12.2021)
2
Structural Safety audit of Science Centre Building, Lodhi Garden, New Delhi
---
Allotted by the DRRI as requested by CSIR
------
Project Leader
Status: Completed
(Oct 2021 to March 2022)
3
Evaluation of Structural Health of Deck Slab of Rob at Nandnagri, Delhi
TSP-1131
Funding Agency:
DTTDC, New Delhi
9.44 Lakh
Project Member
Status: Ongong
(Dec 2021 to Dec 2022)
4
Technical Audit of failure of 4 lane bridge over river Yumuna near Village Manjawali, Distt Fridabad
CNP 2688
PWD, Haryana
37.76 lakh
Project Member
Status: Completed
(March 2021 to Dec 2021)
5
Review of DPR’s of Maharashtra, Sikkim and Uttrakhand States for NRDA
CNP-2751
Funding Agency:
NRIDA
6.50 Lakh
Project Member
Status: Ongoing
(Feb 2022 to Dec 2022)
6
Third Party Technical Assistant in construction of two bridges over Agra Canal at Chainage Km 17.000 and 22.515 near Faridabad
CNP 2651
UP Irrigation
31.66 lakh
Project Member
Status: Ongoing
(Oct 2020 to
Nov 2022)
7
Technical Assistance during construction of four bridges on the left bank along the Agra Canal at Kms 13.000, 14.590,, 14.960 and 15.290 near Delhi
CNP-2754
Funding Agency:
UP Irrigation
23.60 Lakh
Project Member
Status: Ongoing
(March 2022 to Feb 2023)
8
Structural Safety Audit of major bridges at km 938+485 over the river Godavari Near Rajamundry in the state of Andhra Pradesh
CNP-2572
Dwantham Tollway Pvt Ltd.
29.5 lakh
Project Member
Status:Completed
(Jan 2019 to Dec 2020)
9
Structural Safety Audit of Structures on 4 Lane NH connectivity to ICTT Vallarpadam stretch between Kalamassery (Chainge 0+000) to Vallarpadam (Chainage 17+150) on NH 966A in the state of Kerala
CNP 2564
NHAI
59 lakh
Project Member
Status: Completed
(Oct 2019 to March 2021)
10
Structural Safely Audit of major bridges at Km 114+759 and at 67+047 of four –laning of Porbander –Jetpur Section on NH 8B in the State of Gujarat
CNP-2563
Porbander Jetpur Tollway Private Limited
29.50 lakh
Project Member
Status: Completed
(Oct 2019 to
Dec 2020)
11
Quality Audit of all structures of the ‘4 laining of Jetpur Somnath Section of NH 8D from Nm0/000 to Km127/000 in the state of Gujrat DBFOT Toll basis under NHDP-Phase-III” and also test on 14 km distressed road stretches of the section
CNP-2550
National Highway Authority of India
194.7 lakh
Project Member
Status: Completed
(Sept 2019 to March 2021)
12
Third party technical assistant of two bridges on Agra canal at Ch km 6.82, 28.0 near
Faridabad.
CNP-2478
UP Irrigation
23.60 lakh
Project Member
Status: Completed
(Feb 2019 to Feb 2021)
13
Structural Safely Audit and Rehabilitation Measures of Mithaipul, Teliwara, Sadar Bazar, Delhi
CNP-2514
Public Works Department
11.80 lakh
Project Member
Status: Completed
(October 2019)
14
Assessment of Compressive Strength of Concrete of RE Facia Panels of Chandikhole - Jagatpur- Bhubaneswar Section on NH-5 from Km 417.00 to Km 418.00 and from Km 0.000 to Km 62.000 in the state of Odisha
CNP-2426
National Highways Authority of India PIU Bhubaneswar
31.22 lakh
Project Member
Status: Completed
(August 2018)
15
Structural safety Audit of structures in Samakhyali- Gandhidham Section in the state of Gujarat
CNP-2388
NHAI
60 lakh
Project Member
Status: Completed
(March 2019 to Dec 2020)
16
Investigation of Excessive Vibrations at King’s Canyon (B2) Building ASF Insignia SEZ Gurgaon : Part (II): Remedial Measures
CW 12609
ASF Insignia SEZ Pvt. Ltd.
5.1 lakh
Project Member
Status: Completed
(July 2013 to
Oct 2013)
17
Investigation and Remedial Measures for Excessive Vibrations in PNB Building at Parliament Street
CW09692
Punjab National Bank
9.77 lakh
Project Member
Status: Completed
(Nov 2012 to Aug 2013)